The SMW method has many advantages, such as little influence on the surrounding environment, good watertight performance, wide range of application, short construction period, low cost and so on. In this paper, we chose the SMW engineering method combined with anchor cable to support structure in the second phase deep foundation pit of Jinan LuJinDongCheng as the research object, monitored and analysed the horizontal displacement of the pile top, Peripheral surface subsidence and internal force of the anchor cable in the foundation pit. We also discussed the displacement, internal force of anc...